Almond 2 Power Plant
Docket Number:
09-AFC-02 (Application For Certification)
09-AFC-02C (Compliance Proceeding)
Project Status:
Licensed; In Compliance Phase.
Operational: July 13, 2012
The California Energy Commission approved this project's Application For Certification on December 15, 2010. The Commission monitors the power plant's construction, operation and eventual decommissioning through a compliance proceeding.
Key Dates
- May 11, 2009 - Application for Certification (AFC) filed
- July 1, 2009 - Commission accepts AFC as "data adequate."
- April 30, 2010 - Commission staff releases Final Staff Assessment.
- November 5, 2010 - Committee releases Presiding Member's Proposed Decision.
- December 15, 2010 - Commission approves Application for Certification.
- July 13, 2012 - Power plant on line and producing power.
GENERAL DESCRIPTION OF PROJECT
The Almond 2 Power Plant (A2PP) is owned by Turlock Irrigation District (TID), and was certified by the California Energy Commission in December 2010. The approximately 174 megawatt (MW) natural-gas fired, simple-cycle peaking generating facility is located at 4500 Crows Landing Road on a 4.6-acre parcel adjacent to the existing 48 MW TID Almond Power Plant, in Stanislaus County approximately 5 miles south of Modesto.
The A2PP’s primary equipment consists of three identical 58 MW General Electric LM6000PG turbines equipped with a water injection system to the turbine in order to reduce nitrogen oxide (NOx) formation, and a selective catalytic reduction system to further control NOx emissions.
Energy Commission Facility Certification Process
The California Energy Commission is the lead agency (for licensing thermal power plants 50 megawatts and larger) under the California Environmental Quality Act (CEQA) and has a certified regulatory program under CEQA. Under its certified program, the Energy Commission is exempt from having to prepare an environmental impact report. Its certified program, however, does require environmental analysis of the project, including an analysis of alternatives and mitigation measures to minimize any significant adverse effect the project may have on the environment.
For Questions about this Certification Proceeding Contact:
John Heiser
Project Manager
Siting, Transmission and Environmental Protection (STEP) Division
California Energy Commission
1516 Ninth Street, MS-15
Sacramento, CA 95814
Phone: 916-653-8236
E-mail: John.Heiser@energy.ca.gov
For Questions About Public Participation In Certification Proceedings Contact:
Public Advisor
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PublicAdvisor@energy.ca.gov
News Media Please Contact:
Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.ca.gov
Compliance Proceeding
- Submit e-Comment
- Submit e-Filing
- Documents for this Proceeding
(Docket Log) - Exhibit List
- Proof of Service List
- Proof of Service Declaration Form MS Word or PDF
- Search Documents in this Proceeding
- Search All Power Plant Documents
- Project Amendments List
- Legacy Compliance Documents Page
(No Longer Updated)


Original Proceeding
- e-Commenting & e-Filing have been closed. Please use the Compliance Section above.
- Documents for this Proceeding
(Docket Log) - Exhibit List
- Proof of Service List
- Proof of Service Declaration Form MS Word or PDF
- Search Documents in this Proceeding
- Search All Power Plant Documents
- Legacy Notices Page
(No Longer Updated) - Legacy Documents Page
(No Longer Updated)


Calendar



Subscribe
Almond List Serve
Automated Email Notifications