CALIFORNIA ENERGY COMMISSION
ENERGY FACILITY STATUS
Power Plant Projects Since 1996.

COLOR KEY:

      Operational / On Line
      Approved
      In Review
      Pending Local Permits
      On-line date is expected to be delayed beyond the date shown.
      Expected and disclosed
      Planned but undisclosed
      On hold or suspended. According to developers, the new on-line date will be determined when the markets are favorable and financing is available.
      Project approved but cancelled by applicant or approved and license expired before construction began; or proceeding terminated by Commission.

Application for Certification and Emergency Peaker, Power Projects

Projects Operational in 2001, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1a Sunrise Cogeneration, Phase I
Texaco Global Gas and Power & NRG
1998-AFC-04C Operational 320 100 Kern 12/6/2000 12/7/2000 07/2001 6/27/2001
2 Sutter Energy Center
Calpine Corporation
1997-AFC-02C Operational 540 100 Sutter 4/14/1999 7/1/1999 07/2001 7/2/2001
3 Los Medanos (Pittsburg)
Pittsburg District Energy/Calpine
1998-AFC-01C Operational 555 100 Contra Costa 8/17/1999 9/17/1999 07/2001 7/9/2001
4 Larkspur Energy Facility
Wildflower Energy
2001-EP-01C Operational 90 100 San Diego 4/4/2001 4/5/2001 07/2001 7/16/2001
5 Alliance Drews Energy Facility
Alliance Colton
2001-EP-05C Operational 40 100 San Bernardino 4/25/2001 4/26/2001 09/2001 8/15/2001
6 Hanford Peaker Plant
AltaGas San Joaquin Energy, Inc.
2001-EP-07C Operational 95 100 Kings 5/7/2001  
9/30/2001 9/3/2001
7 Indigo Generation Facility
Wildflower Energy
2001-EP-02C Operational 135 100 Riverside 4/4/2001 4/5/2001 09/2001 9/10/2001
8 Alliance Century Energy Facility
Alliance Colton
2001-EP-04C Operational 40 100 San Bernardino 4/25/2001 4/26/2001 09/2001 9/15/2001
9 Enterprise
CalPeak Power, LLC
2001-EP-10C Operational 49.5 100 San Diego 6/6/2001 6/7/2001 09/2001 9/30/2001
10 Border Project
CalPeak Power, LLC
2001-EP-14C Operational 49.5 100 San Diego 7/11/2001 7/12/2001 09/2001 10/26/2001

Subtotal On Line 2001: 1,914 MW

Projects Operational in 2002, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
11 King City Emergency Peaker Project
Calpine
2001-EP-06C Operational 50 100 Monterey 5/2/2001 5/3/2001 09/2001 1/14/2002
12a Gilroy Energy Center, Phase 1 (Unit 1 & 2)
Calpine
2001-EP-08C Operational 0 100 Santa Clara 5/21/2001 5/22/2001 09/2001 1/29/2002
12b Gilroy Energy Center, Phase 2 (Unit 3)
Calpine
2001-EP-08C Operational 135 100 Santa Clara 5/21/2001  
 
2/20/2002
13 Delta Energy Facility
Calpine
1998-AFC-03C Operational 887 100 Contra Costa 2/9/2000 4/1/2000 07/2002 5/10/2002
14 Henrietta Peaker
GWF Energy
2001-AFC-18C Operational 96 100 Kings County 3/7/2002 3/8/2002 06/2002 7/1/2002
15 Moss Landing Modernization, Units 1& 2
Duke Energy
1999-AFC-4C Operational 1,060 100 Monterey County 10/25/2000 11/28/2000 06/2002 7/11/2002
16a Huntington Beach Modernization, Unit 3
AES
2000-AFC-13C Operational 225 100 Orange 5/10/2001 5/31/2001 11/2001 7/31/2002
17a Valero Cogenration, Unit 1
Valero Refining Company
2001-AFC-05C Operational 51 100 Solano County 10/31/2001 11/5/2001 06/2002 10/18/2002

Subtotal On Line 2002: 2,504 MW

Projects Operational in 2003, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
18 Los Esteros 1
Calpine
2001-AFC-12C Operational 180 100 Santa Clara County 7/2/2002 7/8/2002 05/2003 3/7/2003
19 La Paloma Generating Plant
La Paloma Generating Company LLC
1998-AFC-02C Operational 1,124 100 Kern County 10/6/1999 1/1/2000 02/2003 3/7/2003
20 High Desert Power Project
High Desert Power Trust
1997-AFC-01C Operational 830 100 San Bernardino 5/3/2000 5/1/2001 07/2003 4/22/2003
21 Tracy Peaker Plant
GWF Power Systems
2001-AFC-16C Operational 169 100 San Joaquin 7/17/2002 7/22/2002 04/2003 6/1/2003
1b Sunrise Cogeneration, Phase II
Texaco Global Gas and Power & NRG
1998-AFC-04C Operational 265 100 Kern County 11/19/2001 12/7/2001 06/2003 6/1/2003
22 Blythe Energy Project
Blythe Energy, LLC
1999-AFC-08C Operational 520 100 Riverside County 3/21/2001 4/27/2001 04/2003 7/15/2003
23 Elk Hills Power Project
Elk Hills Power LLC
1999-AFC-01C Operational 500 100 Kern County 12/6/2000 6/8/2001 12/2002 7/24/2003
16b Huntington Beach Modernization, Unit 4
AES
00-AFC-13 Operational 225 100 Orange County 5/10/2001 5/31/2001 11/2001 8/7/2003

Subtotal On Line 2003: 3,813 MW

Projects Operational in 2005, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
24 Donald Von Raesfeld (Formerly Pico Power)
Silicon Valley Power
2002-AFC-03C Operational 147 100 Santa Clara County 9/9/2003 9/10/2003 12/2004 3/24/2005
25 Metcalf Energy Center
Calpine
1999-AFC-03C Operational 600 100 Santa Clara County 9/24/2001 1/15/2002 07/2003 5/27/2005
26 Pastoria Energy Facility
Calpine Corporation
1999-AFC-07C Operational 750 100 Kern County 12/20/2000 10/3/2001 01/2003 7/5/2005
27 Magnolia
Southern CA Public Power Authority
2001-AFC-06C Operational 328 100 Los Angeles 3/5/2003 7/21/2003 05/2005 9/22/2005
28 Malburg Generating Station
City of Vernon
2001-AFC-25C Operational 134 100 Los Angeles 5/20/2003 9/11/2003 11/2005 10/17/2005
29a Mountainview Generating Station, Unit 3
Southern California Edison
2000-AFC-02C Operational 1,056 100 San Bernardino 3/21/2001 9/1/2001 06/2003 12/9/2005

Subtotal On Line 2005: 3,015 MW

Projects Operational in 2006, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
29b Mountainview Generating Station, Unit 4
Southern California Edison
2000-AFC-02C Operational 0 100 Oxnard 3/21/2001 9/1/2001 06/2003 1/19/2006
30 Cosumnes Power Plant
SMUD
2001-AFC-19C Operational 500 100 Sacramento 9/9/2003 9/17/2003 06/2005 2/24/2006
31 Walnut Energy Center
Turlock Irrigation District
2002-AFC-04C Operational 250 100 Stanislaus 2/18/2004 3/15/2004 04/2006 2/28/2006
32 Palomar Energy Project
Sempra Energy Resources
2001-AFC-24C Operational 546 100 San Diego 8/6/2003 6/1/2004 03/2006 4/1/2006

Subtotal On Line 2006: 1,296 MW

Projects Operational in 2007, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
33 Bottle Rock Geothermal Power Plant
Bottle Rock L.L.C.
1979-AFC-04C Operational 55 100 Lake Co. 12/13/2006 12/19/2006 06/2007 10/1/2007
34 Roseville Energy Park
Roseville Electric - City of Roseville
2003-AFC-01C Operational 160 100 Placer 4/13/2005 8/18/2005 12/2007 11/5/2007

Subtotal On Line 2007: 215 MW

Projects Operational in 2009, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
35 Gateway Generating Station (formerly Contra Costa Power Plant Unit 8)
Mirant Corporation
2000-AFC-01C Operational 530 100 Contra Costa 5/30/2001 8/30/2001 08/2003 1/4/2009
36a Inland Empire Energy Center, Unit 1
Calpine
2001-AFC-17C Operational 400 100 Riverside 12/17/2003 8/29/2005 12/2005 1/28/2009
37 Midway Peaking Project (formerly Starwood Power)
Starwood Power - Midway LLC
2006-AFC-10C Operational 120 100 Fresno 1/16/2008 9/23/2008 06/2009 5/1/2009
38 Panoche Energy Center
Energy Investors Fund, LLC
2006-AFC-05C Operational 400 100 Fresno County 12/19/2007 2/15/2008 11/2009 7/1/2009
39 Otay Mesa
Otay Mesa Energy Center, LLC/Calpine
1999-AFC-5C Operational 590 100 San Diego 4/18/2001 9/10/2001 07/2003 10/3/2009

Subtotal On Line 2009: 2,040 MW

Projects Operational in 2010, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
40 Orange Grove Energy Center
Orange Grove Energy, L.P.
2008-AFC-4C Operational 96 100 San Diego County 4/8/2009 7/16/2009 12/1/2010 4/1/2010
Blythe Transmission Line
Blythe Energy, LLC
1999-AFC-08C Operational 0 100 Riverside County 10/11/2006 2/23/2009 06/2007 4/1/2010
36b Inland Empire Energy Center
Inland Empire Energy Center LLC
2001-AFC-17C Operational 400 100 Riverside 12/17/2003 8/26/2005 12/2005 5/3/2010
41 Humboldt Bay Generating Station Repowering
Pacific Gas and Electric Company
2006-AFC-07C Operational 163 100 Humboldt County 9/24/2008 10/11/2008 09/2009 10/1/2010
42 Colusa Generating Station
CPV/PG&E
2006-AFC-09C Operational 660 100 Colusa County 4/23/2008 7/28/2008 5/1/2010 12/22/2010

Subtotal On Line 2010: 1,319 MW

Projects Operational in 2011, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
43 Canyon Power Plant
Southern CA Public Power Authority
2007-AFC-9C Operational 200 100 Orange County 3/17/2010 4/15/2010 07/2011 12/2011

Subtotal On Line 2011: 200 MW

Projects Operational in 2012, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
44 Mariposa Energy Project
Mariposa Energy, LLC
2009-AFC-03C Operational 200 100 Alameda County 5/18/2011 6/8/2011 07/2012 10/2011
45 Almond 2 Power Plant
Turlock Irrigation District
2009-AFC-02C Operational 174 100 Stanislaus 12/15/2010 3/1/2011 3/27/2013 7/13/2012
46 Lodi Energy Center
Northern California Power Authority (NCPA)
2008-AFC-10C Operational 255 100 San Joaquin County 4/21/2010 7/14/2010 06/2012 11/1/2012
47 Tracy Combined-Cycle Power Plant
AltaGas San Joaquin Energy Inc
2008-AFC-07C Operational 145 100 San Joaquin County 3/24/2010 1/10/2011 08/2012 11/1/2012

Subtotal On Line 2012: 774 MW

Projects Operational in 2013, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
48 Marsh Landing Generating Station
Marsh Landing, LLC
2008-AFC-03C Operational 760 100 Contra Costa County 8/25/2010 1/15/2010 06/2013 5/1/2013
49 Walnut Creek Energy Park
Walnut Creek Energy LLC
2005-AFC-02C Operational 500 100 Los Angeles County 2/27/2008 06/2011  
5/1/2013
50 CPV Sentinel Energy Project
Competitive Power Ventures
2007-AFC-3C Operational 850 100 Riverside County 12/1/2010 06/2011 08/2013 8/1/2013
51a El Segundo Energy Center, Units: 5,6,7,8
El Segundo Energy Center LLC
2000-AFC-14C Operational 560 100 Los Angeles County 7/1/2010 5/6/2011 08/2011 8/1/2013
52 Russell City Energy Center
Calpine
2001-AFC-07C Operational 600 100 Alameda County 9/11/2002 9/1/2010 2013 8/8/2013
53 Los Esteros Critical Energy Facility Phase II
Calpine
2003-AFC-02C Operational 140 100 Santa Clara 10/11/2006 7/8/2002  
8/9/2013
54a Genesis Solar Energy Projects, Unit 2
NextEra™ Energy Resources LLC
2009-AFC-08C Operational 125 100 Riverside County 9/29/2010 1/17/2011  
11/30/2013
55 Ivanpah Solar Electric Generating System
Solar Partners Brightsource
2007-AFC-05C Operational 370 100 San Bernardino County 9/22/2010 10/2010 10/2012 12/30/2013

Subtotal On Line 2013: 3,905 MW

Projects Operational in 2014, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
54b Genesis Solar Energy Projects, Unit 1
NextEra™ Energy Resources LLC
2009-AFC-08C Operational 125 100 Riverside County 9/29/2010 1/17/2011  
3/7/2014
56 Mojave Solar Project
Abengoa Solar Inc.
2009-AFC-5C Operational 250 100 San Bernardino 9/8/2010 08/2011  
12/9/2014

Subtotal On Line 2014: 375 MW

Projects Operational in 2016, Arranged by Date On Line

Item Count Projects Name
Owner Name

Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
57a Blythe Solar Power Project, Unit 1
NextEra Blythe Solar Energy Center, LLC
2009-AFC-6C Operational 485 100 Riverside 9/15/2010 3/23/2015  
4/28/2016
58 Pio Pico Energy Center
Pio Pico Energy Center, LLC
2011-AFC-1C Operational 300 100 San Diego 9/12/2012 3/9/2015 9/20/2016 10/20/2016
57b Blythe Solar Power Project, Unit 2
NextEra Blythe Solar Energy Center, LLC
2009-AFC-6C Operational 125 100 Riverside 9/15/2010 3/23/2015  
10/28/2016

Subtotal On Line 2016: 910 MW


ON-LINE TOTAL - In Operation: 22,280


Small Power Plant Exemption Projects

SPPE Projects in 2001

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1 MID Woodland Generation Station II
Modesto Irrigation District
2001-SPPE-01Operational80 100 Stanislaus County 9/19/2001 2/21/2002 05/2003 6/6/2003

Subtotal On Line 2001: 80 MW

SPPE Projects in 2003

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
2 Malaga Power Plant
MRP CalPeak Holdings, LLC
2003-SPPE-02Operational97 100 Fresno 5/19/2004 11/1/2004 05/2005 9/19/2005
3 MID Ripon Simple Cycle
Modesto Irrigation District
2003-SPPE-01Operational95 100 San Joaquin 2/4/2004 10/4/2004 04/2005 6/21/2006

Subtotal On Line 2003: 192 MW

SPPE Projects in 2004

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
4a Riverside Energy Resource Center, Unit 1
Riverside Public Utilities
2004-SPPE-01Operational96 100 Riverside 12/15/2004 2/23/2005 06/2005 6/1/2006
4b Riverside Energy Resource Center, Unit 2
Riverside Public Utilities
2004-SPPE-01Operational0 100 Riverside 12/15/2004  
 
7/26/2006

Subtotal On Line 2004: 96 MW

SPPE Projects in 2006

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
5 El Centro Generating Station Unit 3 Repower
Imperial Irrigation District
2006-SPPE-02Operational128 100 Imperial County 1/4/2007 09/2010 04/2012 10/5/2012
6 Niland Peaker
Imperial Irrigation District
2006-SPPE-01Operational93 100 Imperial County 10/11/2006 6/25/2007 08/2005 5/29/2008

Subtotal On Line 2006: 221 MW

SPPE Projects in 2008

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
7 Riverside Energy Resource Center Units 3 & 4 (Expansion Project)
City of Riverside
2008-SPPE-01Operational96 100 Riverside County 2/25/2009 1/4/2010 12/2009 11/2011

Subtotal On Line 2008: 96 MW

SPPE Projects in 2011

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
8 Santa Clara SC-1 Data Center, Phase 2
2011-SPPE-01Operational0*** 100 Santa Clara County 3/28/2012  
 
2015

Subtotal On Line 2011: 0 MW

SPPE Projects in 2017

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Exempted Construction Start Date Original
On-Line Date
Actual
On-Line Date*
9 McLaren Backup Generating Facility
Vantage Data Centers
2017-SPPE-01Pending local permits0*** 0 Santa Clara 11/7/2018  
 
 

Subtotal On Line 2017: 0 MW


ON-LINE TOTAL - In Operation + SPPE: 22,965 MW


Approved Power Projects

Approved and Under Construction, Arranged by Date On Line

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1 Carlsbad Energy Center Project
Carlsbad Energy Center LLC
2007-AFC-6C Under Construction 558 100 San Diego 7/30/2015 3/1/2017 06/2010 12/12/2018
2 Huntington Beach Energy Project (HBEP)
AES Southland
2012-AFC-02C Under Construction 939 100 Orange County 4/12/2017  
08/2018  
3 Alamitos Energy Center
AES Southland Development, LLC
2013-AFC-01C Under Construction 1,040 100 Los Angeles County 4/12/2017  
04/2020  

Approved and/or Under Construction Subtotal: 2,537 MW

Approved and Under Pre-Construction, Arranged by Date On Line

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1 Stanton Energy Reliability Center
Stanton Energy Reliability Center, LLC
2016-AFC-01C Pre-Construction 98 Orange County 11/7/2018  
2/28/2020  

Approved and/or Under Pre-Construction Subtotal: 98 MW


Approved and/or Under Construction Total (Pre-Const and Const): 2,635 MW

Approved and On Hold - Not under Construction, Arranged by Project Name

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1 Palmdale Energy Project (Formerly Palmdale Hybrid Power Project)
Palmdale Energy, LLC
2008-AFC-09 On Hold Before Construction 645 0 Los Angeles  
 
 
 
2 Rice Solar Energy Project
Rice Solar Energy LLC
2009-AFC-10C On Hold Before Construction 150 0 Riverside County 12/15/2010 9/1/2011 03/2014  

Subtotal Approved and "Available" for Construction: 795 MW

Approved License - Revoked by Commission, Arranged by Project Name

Item Count Project Name
Owner Name
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
A Argus Cogeneration Expansion (ACE) Project
ACE Cogeneration Company
1986-AFC-1C License Terminated 100 0 Trona, San Bernardino County 1/6/1988  
 
1/1/1991
B Black Rock 1 2 3 Geothermal Power Project [Formerly Salton Sea Geothermal]
Cal Energy
2002-AFC-02C License Terminated 159 0 Imperial County 12/17/2003  
01/2006  
C Blythe Energy Project Phase II [Sonoran Energy Project Petition to Amend Withdrawn]
AltaGas Sonoran Energy, Inc.
2002-AFC-01C License Expired 520 0 Riverside County 12/14/2005  
 
 
D FPL Tesla
Florida Power & Light
2001-AFC-21C License Expired 1,120 0 Alameda County 6/16/2004  
 
 
E Hanford Combined-Cycle Power Plant
GWF Energy LLC
2001-EP-07C License Terminated 25 0 Kings 3/24/2010  
 
 
F Oakley Generating Station
Contra Costa Generating Station, LLC
2009-AFC-04C License Terminated 624 10 Contra Costa 5/18/2011 6/8/2011  
 
G Palen Solar Power Project
Maverick Solar, LLC
2009-AFC-7C License Expired 500 0 Riverside 12/15/2010  
 
 
H Pastoria Energy Facility Expansion Project (Simple Cycle Addition)
Pastoria Energy LLC
2005-AFC-01C License Expired 160 0 Kern County 11/8/2006  
 
 
I Sacramento Ethanol Partners Cogen (SEPCO)
Sacramento Power Inc
1992-AFC-02C License Terminated 148.5 0 5/11/1994  
 
 
J San Francisco Energy Company
1994-AFC-01C License Terminated 240 0 San Francisco County 3/31/1996  
 
 
K San Joaquin Valley Energy Center
Calpine
2001-AFC-22C License Expired 1,087 0 Fresno County 1/14/2004  
 
 
L SCE Solar 100
Southern California Edison
1981-AFC-04C License Expired 110 0 San Bernardino County 12/29/1982  
 
 
M Three Mountain
Three Mountain Power / Covanta
1999-AFC-02C License Expired 500 0 Shasta County 5/16/2001  
 
 
N United Golden Gate (Peaker)
El Paso Merchant Energy
2000-AFC-05C License Expired 51 0 San Mateo County 3/7/2001  
 
 
O Western Midway Sunset Project
Midway Sunset Cogeneration Company
1999-AFC-09C License Expired 500 0 Kern County 3/21/2001  
 
 

Subtotal Approved but Will Not Be Built: 5,844.5


APPROVED TOTAL: 32,239.5 MW


Projects Not Approved

License Terminated by Commission, Arranged by Decision Date

Project name
Owner Name
Docket
Number
Process Capacity (MW) Project Type Location Date Filed Decision Date
Puente Power Project (P3)
NRG Oxnard Energy Center LLC
2015-AFC-01 12-Month AFC 262  
Oxnard 4/15/2015  
Potrero Unit 7
Mirant Corporation
2000-AFC-04 12-month 540 Brown Field San Francisco County 5/31/2000 3/1/2006
Ridgecrest Solar Power Project
Solar Millennium LLC & Chevron Energy Solutions
2009-AFC-09 12-Month AFC 250 Green Field Kern County 9/1/2009 4/22/2014
San Gabriel Generating Station
Reliant Energy
2007-AFC-02 12-Month AFC 656 Brown Field San Bernardino County 4/13/2007 10/19/2015
Sun Valley Energy Project (Peaker)
NRG
2005-AFC-03 12-Month AFC 500 Green Field Riverside County 12/1/2005 10/19/2015
Willow Pass Generating Station
Mirant Corporation
2008-AFC-06 12-Month AFC 550 Brown Field Contra Costa County 6/30/2008 10/19/2015

Subtotal License Terminated: 2,758

License Denied by Commission, Arranged by Decision Date

Project Name
Owner Name
Docket
Number
Process Capacity (MW) Project Type Location Date Filed Decision Date
Santa Maria Aggregate
1987-AFC-02 AFC 50  
  7/27/1987  
Pacific Waste Management Irwindale MSW
1984-AFC-05 AFC 80  
  10/31/1984  
Eastshore Energy Center
Eastshore Energy LLC
2006-AFC-06 12-Month AFC 116 Brown Field Alameda County 9/22/2006 10/8/2008
Chula Vista Energy Upgrade Project
MMC Energy Inc.
2007-AFC-04 12-Month AFC 100 Brown Field San Diego County 8/10/2007 6/17/2009

Subtotal License Denied: 346 MW


Withdrawn Projects List


Projects in Review

Projects in Review, Arranged Alphabetically

Item Count Project Name
Owner Name
Docket
Number
Process Capacity (MW) Project Type Location Date Filed Estimated Decision Date Estimate On-line Date**
1 Laurelwood Data Center
MECP1 Santa Clara 1, LLC
2019-SPPE-01 SPPE 99  
Santa Clara 3/5/2019  
 
2 Sequoia Data Center
C1-Santa Clara, LLC
2019-SPPE-03 SPPE 96.5  
Santa Clara 8/12/2019  
 
3 Walsh Data Center
651 Walsh Partners LLC
2019-SPPE-02 SPPE 80  
Santa Clara 6/28/2019  
 
a Redondo Beach Repower
AES Southland Development, LLC
2012-AFC-03 12-Month AFC 496  
Los Angeles County 11/19/2012 Under Suspension Until Filed to Reopen Proceeding Under Suspension Until Filed to Reopen Proceeding

UNDER REVIEW TOTAL (Excludes Suspended): 275.5


Projects Announced

Projects Announced, Arranged Alphabetically

Item Count Project Name Process Project Type Capacity (MW) Location Estimated
Filing Date
1 Hell's Kitchen Geothermal Project
Controlled Thermal Resources
12-Month AFC Geothermal Steam Turbine 250 Salton Sea, Imperial County  

ANNOUNCED TOTAL: 250


Notes:

* Estimated on-line date if construction is not delayed.

** Estimated on-line date if approved and constructed as proposed.

*** Electricity generation from data center backup generation equipment does not feed into the grid, and therefore contributes zero megawatts (MW)/megawatt hours (MWh) to the system. However, a net MW capacity for the data center backup generation equipment can be calculated to allow a jurisdictional determination. These data centers had a thermal generation capacity of between 50 and 100 MW, allowing each to be processed as a small power plant exemption (SPPE).

Projects with EP in docket number are emergency siting projects.

Megawatts in [ ] are not included in totals.

{1} 1002 MW replaced with 1200 MW for a net increase of 198 MW

{2} 339 MW replaced with 630 MW for a net increase of 291 MW

{3} Calpine has received Commission approval to amend the project to add "duct firing," thereby increasing the total generating capacity from 510 to 590 MW.

{4} Amendment Approved 2/2/2011.

{5} Total MW includes 130 MW amendment approved 6/22/05.

{6} Calpine needs to obtain a new or amended Commission decision for a new location for the Russell City Project (01-AFC-7) approved September 11, 2002, but since "on hold."

{7} El Centro project (06-SPPE-2) is repower of 44 MW Unit 3 at Imperial Irrigation District El Centro Generating Station with 128 MW new facility, for a net increase of 84+ MW.

MW for projects withdrawn, cancelled or expired are not included in total available for possible construction.

Definitions:

Green Field - undeveloped site

Brown Field - developed site

Expansion - New unit at existing power plant site, no loss of existing generation

Repower - Modification of existing equipment

Replacement - Demolition of old plant and construction of new plant

On Hold indicates the applicant has suspended work.

Suspended indicates the committee has suspended the proceeding.