Status of All Projects
CALIFORNIA ENERGY COMMISSION
ENERGY FACILITY STATUS
Power Plant Projects Since 1996.
COLOR KEY:
Operational / On Line
Approved
In Review
Pending Local Permits
On-line date is expected to be delayed beyond the date shown.
Expected and disclosed
Planned but undisclosed
On hold or suspended. According to developers, the new on-line date will be determined when the markets are favorable and financing is available.
Project approved but cancelled by applicant or approved and license expired before construction began; or proceeding terminated by Commission.
Application for Certification and Emergency Peaker, Power Projects
AFC and Emergency Peaker Power Projects, Operational in 2001, Arranged by Date On Line, 10 projects under this year.
Projects Operational in 2001, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
1a | Sunrise Power Project, Phase I Texaco Global Gas and Power & NRG |
1998-AFC-04C | Operational | 320 | 100 | Kern | 12/6/2000 | 12/7/2000 | 07/2001 | 6/27/2001 |
2 | Sutter Energy Center Calpine Corporation |
1997-AFC-02C | Operational | 540 | 100 | Sutter | 4/14/1999 | 7/1/1999 | 07/2001 | 7/2/2001 |
3 | Los Medanos (Pittsburg) Pittsburg District Energy/Calpine |
1998-AFC-01C | Operational | 555 | 100 | Contra Costa | 8/17/1999 | 9/17/1999 | 07/2001 | 7/9/2001 |
4 | Larkspur Energy Facility Wildflower Energy |
2001-EP-01C | Operational | 90 | 100 | San Diego | 4/4/2001 | 4/5/2001 | 07/2001 | 7/16/2001 |
5 | Alliance Drews Energy Facility Alliance Colton |
2001-EP-05 | Operational | 40 | 100 | San Bernardino | 4/25/2001 | 4/26/2001 | 09/2001 | 8/15/2001 |
6 | Hanford Peaker Plant AltaGas San Joaquin Energy, Inc. |
2001-EP-07C | Operational | 95 | 100 | Kings | 5/7/2001 | |
9/30/2001 | 9/3/2001 |
7 | Indigo Energy Facility Wildflower Energy |
2001-EP-02C | Operational | 135 | 100 | Riverside | 4/4/2001 | 4/5/2001 | 09/2001 | 9/10/2001 |
8 | Alliance Century Energy Facility Alliance Colton |
2001-EP-04C | Operational | 40 | 100 | San Bernardino | 4/25/2001 | 4/26/2001 | 09/2001 | 9/15/2001 |
9 | Enterprise CalPeak Power, LLC |
2001-EP-10C | Operational | 49.5 | 100 | San Diego | 6/6/2001 | 6/7/2001 | 09/2001 | 9/30/2001 |
10 | Border Project CalPeak Power, LLC |
2001-EP-14C | Operational | 49.5 | 100 | San Diego | 7/11/2001 | 7/12/2001 | 09/2001 | 10/26/2001 |
Subtotal On Line 2001: 1,914 MW
AFC and Emergency Peaker Power Projects, Operational in 2002, Arranged by Date On Line, 8 projects under this year.
Projects Operational in 2002, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
11 | King City Energy Center Calpine |
2001-EP-06C | Operational | 50 | 100 | Monterey | 5/2/2001 | 5/3/2001 | 09/2001 | 1/14/2002 |
12a | Gilroy Energy Center, Phase 1 (Unit 1 & 2) Calpine |
2001-EP-08C | Operational | 0 | 100 | Santa Clara | 5/21/2001 | 5/22/2001 | 09/2001 | 1/29/2002 |
12b | Gilroy Energy Center, Phase 2 (Unit 3) Calpine |
2001-EP-08C | Operational | 135 | 100 | Santa Clara | 5/21/2001 | |
|
2/20/2002 |
13 | Delta Energy Center Calpine |
1998-AFC-03C | Operational | 887 | 100 | Contra Costa | 2/9/2000 | 4/1/2000 | 07/2002 | 5/10/2002 |
14 | Henrietta Peaker GWF Energy |
2001-AFC-18C | Operational | 96 | 100 | Kings County | 3/7/2002 | 3/8/2002 | 06/2002 | 7/1/2002 |
15 | Moss Landing Power Plant VistaEnergy, Inc |
1999-AFC-4C | Operational | 1,060 | 100 | Monterey County | 10/25/2000 | 11/28/2000 | 06/2002 | 7/11/2002 |
16a | Huntington Beach Generating Station, Unit 3 AES |
2000-AFC-13C | Operational | 225 | 100 | Orange | 5/10/2001 | 5/31/2001 | 11/2001 | 7/31/2002 |
17a | Valero Cogenration, Unit 1 Valero Refining Company |
2001-AFC-05C | Operational | 51 | 100 | Solano County | 10/31/2001 | 11/5/2001 | 06/2002 | 10/18/2002 |
Subtotal On Line 2002: 2,504 MW
AFC and Emergency Peaker Power Projects, Operational in 2003, Arranged by Date On Line, 8 projects under this year.
Projects Operational in 2003, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
18 | Los Esteros 1 Calpine |
2001-AFC-12C | Operational | 180 | 100 | Santa Clara County | 7/2/2002 | 7/8/2002 | 05/2003 | 3/7/2003 |
19 | La Paloma Generating Plant La Paloma Generating Company LLC |
1998-AFC-02C | Operational | 1,124 | 100 | Kern County | 10/6/1999 | 1/1/2000 | 02/2003 | 3/7/2003 |
20 | High Desert Power Project High Desert Power Trust |
1997-AFC-01C | Operational | 830 | 100 | San Bernardino | 5/3/2000 | 5/1/2001 | 07/2003 | 4/22/2003 |
21 | Tracy Peaker Plant GWF Power Systems |
2001-AFC-16C | Operational | 169 | 100 | San Joaquin | 7/17/2002 | 7/22/2002 | 04/2003 | 6/1/2003 |
1b | Sunrise Power Project, Phase II Texaco Global Gas and Power & NRG |
1998-AFC-04C | Operational | 265 | 100 | Kern County | 11/19/2001 | 12/7/2001 | 06/2003 | 6/1/2003 |
22 | Blythe Energy Project Blythe Energy, LLC |
1999-AFC-08C | Operational | 520 | 100 | Riverside County | 3/21/2001 | 4/27/2001 | 04/2003 | 7/15/2003 |
23 | Elk Hills Power Project Elk Hills Power LLC |
1999-AFC-01C | Operational | 500 | 100 | Kern County | 12/6/2000 | 6/8/2001 | 12/2002 | 7/24/2003 |
16b | Huntington Beach Generating Station, Unit 4 AES |
00-AFC-13 | Operational | 225 | 100 | Orange County | 5/10/2001 | 5/31/2001 | 11/2001 | 8/7/2003 |
Subtotal On Line 2003: 3,813 MW
AFC and Emergency Peaker Power Projects, Operational in 2005, Arranged by Date On Line, 6 projects under this year.
Projects Operational in 2005, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
24 | Donald Von Raesfeld (Formerly Pico Power) Silicon Valley Power |
2002-AFC-03C | Operational | 147 | 100 | Santa Clara County | 9/9/2003 | 9/10/2003 | 12/2004 | 3/24/2005 |
25 | Metcalf Energy Center Calpine |
1999-AFC-03C | Operational | 600 | 100 | Santa Clara County | 9/24/2001 | 1/15/2002 | 07/2003 | 5/27/2005 |
26 | Pastoria Energy Facility Calpine Corporation |
1999-AFC-07C | Operational | 750 | 100 | Kern County | 12/20/2000 | 10/3/2001 | 01/2003 | 7/5/2005 |
27 | Magnolia Southern CA Public Power Authority |
2001-AFC-06C | Operational | 328 | 100 | Los Angeles | 3/5/2003 | 7/21/2003 | 05/2005 | 9/22/2005 |
28 | Malburg Generating Station City of Vernon |
2001-AFC-25C | Operational | 134 | 100 | Los Angeles | 5/20/2003 | 9/11/2003 | 11/2005 | 10/17/2005 |
29a | Mountainview Generating Station, Unit 3 Southern California Edison |
2000-AFC-02C | Operational | 1,056 | 100 | San Bernardino | 3/21/2001 | 9/1/2001 | 06/2003 | 12/9/2005 |
Subtotal On Line 2005: 3,015 MW
AFC and Emergency Peaker Power Projects, Operational in 2006, Arranged by Date On Line, 4 projects under this year.
Projects Operational in 2006, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
29b | Mountainview Generating Station, Unit 4 Southern California Edison |
2000-AFC-02C | Operational | 0 | 100 | Oxnard | 3/21/2001 | 9/1/2001 | 06/2003 | 1/19/2006 |
30 | Cosumnes Power Plant SMUD |
2001-AFC-19C | Operational | 500 | 100 | Sacramento | 9/9/2003 | 9/17/2003 | 06/2005 | 2/24/2006 |
31 | Walnut Energy Center Turlock Irrigation District |
2002-AFC-04C | Operational | 250 | 100 | Stanislaus | 2/18/2004 | 3/15/2004 | 04/2006 | 2/28/2006 |
32 | Palomar Energy Project Sempra Energy Resources |
2001-AFC-24C | Operational | 546 | 100 | San Diego | 8/6/2003 | 6/1/2004 | 03/2006 | 4/1/2006 |
Subtotal On Line 2006: 1,296 MW
AFC and Emergency Peaker Power Projects, Operational in 2007, Arranged by Date On Line, 2 projects under this year.
Projects Operational in 2007, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
33 | Bottle Rock Geothermal Power Plant Bottle Rock L.L.C. |
1979-AFC-04C | Operational | 55 | 100 | Lake Co. | 12/13/2006 | 12/19/2006 | 06/2007 | 10/1/2007 |
34 | Roseville Energy Park Roseville Electric - City of Roseville |
2003-AFC-01C | Operational | 160 | 100 | Placer | 4/13/2005 | 8/18/2005 | 12/2007 | 11/5/2007 |
Subtotal On Line 2007: 215 MW
AFC and Emergency Peaker Power Projects, Operational in 2009, Arranged by Date On Line, 5 projects under this year.
Projects Operational in 2009, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
35 | Gateway Generating Station (formerly Contra Costa Power Plant Unit 8) Mirant Corporation |
2000-AFC-01C | Operational | 530 | 100 | Contra Costa | 5/30/2001 | 8/30/2001 | 08/2003 | 1/4/2009 |
36a | Inland Empire Energy Center, Unit 1 Calpine |
2001-AFC-17C | Operational | 400 | 100 | Riverside | 12/17/2003 | 8/29/2005 | 12/2005 | 1/28/2009 |
37 | Midway Peaking Project (formerly Starwood Power) Starwood Power - Midway LLC |
2006-AFC-10C | Operational | 120 | 100 | Fresno | 1/16/2008 | 9/23/2008 | 06/2009 | 5/1/2009 |
38 | Panoche Energy Center Energy Investors Fund, LLC |
2006-AFC-05C | Operational | 400 | 100 | Fresno County | 12/19/2007 | 2/15/2008 | 11/2009 | 7/1/2009 |
39 | Otay Mesa Otay Mesa Energy Center, LLC/Calpine |
1999-AFC-5C | Operational | 590 | 100 | San Diego | 4/18/2001 | 9/10/2001 | 07/2003 | 10/3/2009 |
Subtotal On Line 2009: 2,040 MW
AFC and Emergency Peaker Power Projects, Operational in 2010, Arranged by Date On Line, 5 projects under this year.
Projects Operational in 2010, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
40 | Orange Grove Energy Center Orange Grove Energy, L.P. |
2008-AFC-4C | Operational | 96 | 100 | San Diego County | 4/8/2009 | 7/16/2009 | 12/1/2010 | 4/1/2010 |
Blythe Transmission Line Blythe Energy, LLC |
1999-AFC-08C | Operational | 0 | 100 | Riverside County | 10/11/2006 | 2/23/2009 | 06/2007 | 4/1/2010 | |
36b | Inland Empire Energy Center Inland Empire Energy Center LLC |
2001-AFC-17C | Operational | 400 | 100 | Riverside | 12/17/2003 | 8/26/2005 | 12/2005 | 5/3/2010 |
41 | Humboldt Bay Generating Station Repowering Pacific Gas and Electric Company |
2006-AFC-07C | Operational | 163 | 100 | Humboldt County | 9/24/2008 | 10/11/2008 | 09/2009 | 10/1/2010 |
42 | Colusa Generating Station CPV/PG&E |
2006-AFC-09C | Operational | 660 | 100 | Colusa County | 4/23/2008 | 7/28/2008 | 5/1/2010 | 12/22/2010 |
Subtotal On Line 2010: 1,319 MW
AFC and Emergency Peaker Power Projects, Operational in 2011, Arranged by Date On Line, 1 projects under this year.
Projects Operational in 2011, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
43 | Canyon Power Plant Southern CA Public Power Authority |
2007-AFC-9C | Operational | 200 | 100 | Orange County | 3/17/2010 | 4/15/2010 | 07/2011 | 12/2011 |
Subtotal On Line 2011: 200 MW
AFC and Emergency Peaker Power Projects, Operational in 2012, Arranged by Date On Line, 4 projects under this year.
Projects Operational in 2012, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
44 | Mariposa Energy Project Mariposa Energy, LLC |
2009-AFC-03C | Operational | 200 | 100 | Alameda County | 5/18/2011 | 6/8/2011 | 07/2012 | 10/2011 |
45 | Almond 2 Power Plant Turlock Irrigation District |
2009-AFC-02C | Operational | 174 | 100 | Stanislaus | 12/15/2010 | 3/1/2011 | 3/27/2013 | 7/13/2012 |
46 | Lodi Energy Center Northern California Power Authority (NCPA) |
2008-AFC-10C | Operational | 255 | 100 | San Joaquin County | 4/21/2010 | 7/14/2010 | 06/2012 | 11/1/2012 |
47 | Tracy Combined-Cycle Power Plant AltaGas San Joaquin Energy Inc |
2008-AFC-07C | Operational | 145 | 100 | San Joaquin County | 3/24/2010 | 1/10/2011 | 08/2012 | 11/1/2012 |
Subtotal On Line 2012: 774 MW
AFC and Emergency Peaker Power Projects, Operational in 2013, Arranged by Date On Line, 8 projects under this year.
Projects Operational in 2013, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
48 | Marsh Landing Generating Station Marsh Landing, LLC |
2008-AFC-03C | Operational | 760 | 100 | Contra Costa County | 8/25/2010 | 1/15/2010 | 06/2013 | 5/1/2013 |
49 | Walnut Creek Energy Park Walnut Creek Energy LLC |
2005-AFC-02C | Operational | 500 | 100 | Los Angeles County | 2/27/2008 | 06/2011 | |
5/1/2013 |
50 | CPV Sentinel Energy Project Competitive Power Ventures |
2007-AFC-3C | Operational | 850 | 100 | Riverside County | 12/1/2010 | 06/2011 | 08/2013 | 8/1/2013 |
51a | El Segundo Energy Center, Units: 5,6,7,8 El Segundo Energy Center LLC |
2000-AFC-14C | Operational | 560 | 100 | Los Angeles County | 7/1/2010 | 5/6/2011 | 08/2011 | 8/1/2013 |
52 | Russell City Energy Center Calpine |
2001-AFC-07C | Operational | 600 | 100 | Alameda County | 9/11/2002 | 9/1/2010 | 2013 | 8/8/2013 |
53 | Los Esteros Critical Energy Facility Phase II Calpine |
2003-AFC-02C | Operational | 140 | 100 | Santa Clara | 10/11/2006 | 7/8/2002 | |
8/9/2013 |
54a | Genesis Solar Energy Projects, Unit 2 NextEraâ„¢ Energy Resources LLC |
2009-AFC-08C | Operational | 125 | 100 | Riverside County | 9/29/2010 | 1/17/2011 | |
11/30/2013 |
55 | Ivanpah Solar Electric Generating System Solar Partners Brightsource |
2007-AFC-05C | Operational | 370 | 100 | San Bernardino County | 9/22/2010 | 10/2010 | 10/2012 | 12/30/2013 |
Subtotal On Line 2013: 3,905 MW
AFC and Emergency Peaker Power Projects, Operational in 2014, Arranged by Date On Line, 2 projects under this year.
Projects Operational in 2014, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
54b | Genesis Solar Energy Projects, Unit 1 NextEraâ„¢ Energy Resources LLC |
2009-AFC-08C | Operational | 125 | 100 | Riverside County | 9/29/2010 | 1/17/2011 | |
3/7/2014 |
56 | Mojave Solar Project Abengoa Solar Inc. |
2009-AFC-5C | Operational | 250 | 100 | San Bernardino | 9/8/2010 | 08/2011 | |
12/9/2014 |
Subtotal On Line 2014: 375 MW
AFC and Emergency Peaker Power Projects, Operational in 2016, Arranged by Date On Line, 3 projects under this year.
Projects Operational in 2016, Arranged by Date On Line
Item Count | Projects Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
57a | Blythe Solar Power Project, Unit 1 NextEra Blythe Solar Energy Center, LLC |
2009-AFC-6C | Operational | 485 | 100 | Riverside | 9/15/2010 | 3/23/2015 | |
4/28/2016 |
58 | Pio Pico Energy Center Pio Pico Energy Center, LLC |
2011-AFC-1C | Operational | 300 | 100 | San Diego | 9/12/2012 | 3/9/2015 | 9/20/2016 | 10/20/2016 |
57b | Blythe Solar Power Project, Unit 2 NextEra Blythe Solar Energy Center, LLC |
2009-AFC-6C | Operational | 125 | 100 | Riverside | 9/15/2010 | 3/23/2015 | |
10/28/2016 |
Subtotal On Line 2016: 910 MW
ON-LINE TOTAL - In Operation: 22,280
Small Power Plant Exemption Projects
Small Power Plant Exemption Projects in 2001, 1 projects under this year.
SPPE Projects in 2001
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
1 | MID Woodland Generation Station II Modesto Irrigation District |
2001-SPPE-01 | Operational | 80 | 100 | Stanislaus County | 9/19/2001 | 2/21/2002 | 05/2003 | 6/6/2003 |
Subtotal On Line 2001: 80 MW
Small Power Plant Exemption Projects in 2003, 2 projects under this year.
SPPE Projects in 2003
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
2 | Malaga Power Plant MRP CalPeak Holdings, LLC |
2003-SPPE-02 | Operational | 97 | 100 | Fresno | 5/19/2004 | 11/1/2004 | 05/2005 | 9/19/2005 |
3 | MID Ripon Simple Cycle Modesto Irrigation District |
2003-SPPE-01 | Operational | 95 | 100 | San Joaquin | 2/4/2004 | 10/4/2004 | 04/2005 | 6/21/2006 |
Subtotal On Line 2003: 192 MW
Small Power Plant Exemption Projects in 2004, 2 projects under this year.
SPPE Projects in 2004
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
4a | Riverside Energy Resource Center, Unit 1 Riverside Public Utilities |
2004-SPPE-01 | Operational | 96 | 100 | Riverside | 12/15/2004 | 2/23/2005 | 06/2005 | 6/1/2006 |
4b | Riverside Energy Resource Center, Unit 2 Riverside Public Utilities |
2004-SPPE-01 | Operational | 0 | 100 | Riverside | 12/15/2004 | |
|
7/26/2006 |
Subtotal On Line 2004: 96 MW
Small Power Plant Exemption Projects in 2006, 2 projects under this year.
SPPE Projects in 2006
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
5 | El Centro Generating Station Unit 3 Repower Imperial Irrigation District |
2006-SPPE-02 | Operational | 128 | 100 | Imperial County | 1/4/2007 | 09/2010 | 04/2012 | 10/5/2012 |
6 | Niland Peaker Imperial Irrigation District |
2006-SPPE-01 | Operational | 93 | 100 | Imperial County | 10/11/2006 | 6/25/2007 | 08/2005 | 5/29/2008 |
Subtotal On Line 2006: 221 MW
Small Power Plant Exemption Projects in 2008, 1 projects under this year.
SPPE Projects in 2008
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
7 | Riverside Energy Resource Center Units 3 & 4 (Expansion Project) City of Riverside |
2008-SPPE-01 | Operational | 96 | 100 | Riverside County | 2/25/2009 | 1/4/2010 | 12/2009 | 11/2011 |
Subtotal On Line 2008: 96 MW
Small Power Plant Exemption Projects in 2011, 1 projects under this year.
SPPE Projects in 2011
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
8 | Santa Clara SC-1 Data Center, Phase 2 |
2011-SPPE-01 | Operational | 0*** | 100 | Santa Clara County | 3/28/2012 | |
|
2015 |
Subtotal On Line 2011: 0 MW
Small Power Plant Exemption Projects in 2017, 1 projects under this year.
SPPE Projects in 2017
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Exempted | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
9 | McLaren Backup Generating Facility Vantage Data Centers |
2017-SPPE-01 | Pending local permits | 0*** | 0 | Santa Clara | 11/7/2018 | |
|
|
Subtotal On Line 2017: 0 MW
ON-LINE TOTAL - In Operation + SPPE: 22,965 MW
Approved Power Projects
Approved and Under Construction, Arranged by Date On Line, 3 projects in list.
Approved and Under Construction, Arranged by Date On Line
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
1 | Carlsbad Energy Center Project Carlsbad Energy Center LLC |
2007-AFC-6C | Under Construction | 558 | 100 | San Diego | 7/30/2015 | 3/1/2017 | 06/2010 | 12/12/2018 |
2 | Huntington Beach Energy Project (HBEP) AES Southland |
2012-AFC-02C | Under Construction | 939 | 100 | Orange County | 4/12/2017 | |
08/2018 | |
3 | Alamitos Energy Center AES Southland Development, LLC |
2013-AFC-01C | Under Construction | 1,040 | 100 | Los Angeles County | 4/12/2017 | |
04/2020 | |
Approved and/or Under Construction Subtotal: 2,537 MW
Approved and Under Pre-Construction, Arranged by Date On Line, 1 projects in list.
Approved and Under Pre-Construction, Arranged by Date On Line
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
1 | Stanton Energy Reliability Center Stanton Energy Reliability Center, LLC |
2016-AFC-01C | Pre-Construction | 98 | Orange County | 11/7/2018 | |
2/28/2020 | |
Approved and/or Under Pre-Construction Subtotal: 98 MW
Approved and/or Under Construction Total (Pre-Const and Const): 2,635 MW
Approved and On Hold - Not under Construction, Arranged by Project Name, 2 projects in list.
Approved and On Hold - Not under Construction, Arranged by Project Name
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
1 | Palmdale Energy Project (Formerly Palmdale Hybrid Power Project) Palmdale Energy, LLC |
2008-AFC-09 | On Hold Before Construction | 645 | 0 | Los Angeles | |
|
|
|
2 | Rice Solar Energy Project Rice Solar Energy LLC |
2009-AFC-10C | On Hold Before Construction | 150 | 0 | Riverside County | 12/15/2010 | 9/1/2011 | 03/2014 | |
Subtotal Approved and "Available" for Construction: 795 MW
Approved License - Revoked by Commission, Arranged by Project Name, 15 projects in list.
Approved License - Revoked by Commission, Arranged by Project Name
Item Count | Project Name Owner Name |
Docket Number |
Status | Capacity (MW) | Construction Completed (percent) |
Location | Date Approved | Construction Start Date | Original On-Line Date |
Actual On-Line Date* |
---|---|---|---|---|---|---|---|---|---|---|
A | Argus Cogeneration Expansion (ACE) Project ACE Cogeneration Company |
1986-AFC-1C | License Terminated | 100 | 0 | Trona, San Bernardino County | 1/6/1988 | |
|
1/1/1991 |
B | Black Rock 1 2 3 Geothermal Power Project [Formerly Salton Sea Geothermal] Cal Energy |
2002-AFC-02C | License Terminated | 159 | 0 | Imperial County | 12/17/2003 | |
01/2006 | |
C | Blythe Energy Project Phase II [Sonoran Energy Project Petition to Amend Withdrawn] AltaGas Sonoran Energy, Inc. |
2002-AFC-01C | License Expired | 520 | 0 | Riverside County | 12/14/2005 | |
|
|
D | FPL Tesla Florida Power & Light |
2001-AFC-21C | License Expired | 1,120 | 0 | Alameda County | 6/16/2004 | |
|
|
E | Hanford Combined-Cycle Power Plant GWF Energy LLC |
2001-EP-07C | License Terminated | 25 | 0 | Kings | 3/24/2010 | |
|
|
F | Oakley Generating Station Contra Costa Generating Station, LLC |
2009-AFC-04C | License Terminated | 624 | 10 | Contra Costa | 5/18/2011 | 6/8/2011 | |
|
G | Palen Solar Power Project Maverick Solar, LLC |
2009-AFC-7C | License Expired | 500 | 0 | Riverside | 12/15/2010 | |
|
|
H | Pastoria Energy Facility Expansion Project (Simple Cycle Addition) Pastoria Energy LLC |
2005-AFC-01C | License Expired | 160 | 0 | Kern County | 11/8/2006 | |
|
|
I | Sacramento Ethanol Partners Cogen (SEPCO) Sacramento Power Inc |
1992-AFC-02C | License Terminated | 148.5 | 0 | 5/11/1994 | |
|
|
|
J | San Francisco Energy Company |
1994-AFC-01C | License Terminated | 240 | 0 | San Francisco County | 3/31/1996 | |
|
|
K | San Joaquin Valley Energy Center Calpine |
2001-AFC-22C | License Expired | 1,087 | 0 | Fresno County | 1/14/2004 | |
|
|
L | SCE Solar 100 Southern California Edison |
1981-AFC-04C | License Expired | 110 | 0 | San Bernardino County | 12/29/1982 | |
|
|
M | Three Mountain Three Mountain Power / Covanta |
1999-AFC-02C | License Expired | 500 | 0 | Shasta County | 5/16/2001 | |
|
|
N | United Golden Gate (Peaker) El Paso Merchant Energy |
2000-AFC-05C | License Expired | 51 | 0 | San Mateo County | 3/7/2001 | |
|
|
O | Western Midway Sunset Project Midway Sunset Cogeneration Company |
1999-AFC-09C | License Expired | 500 | 0 | Kern County | 3/21/2001 | |
|
|
Subtotal Approved but Will Not Be Built: 5,844.5
APPROVED TOTAL: 32,239.5 MW
Projects Not Approved
License Terminated by Commission, Arranged by Decision Date, 6 projects in list.
License Terminated by Commission, Arranged by Decision Date
Project name Owner Name |
Docket Number |
Process | Capacity (MW) | Project Type | Location | Date Filed | Decision Date |
---|---|---|---|---|---|---|---|
Puente Power Project (P3) NRG Oxnard Energy Center LLC |
2015-AFC-01 | 12-Month AFC | 262 | |
Oxnard | 4/15/2015 | |
Potrero Unit 7 Mirant Corporation |
2000-AFC-04 | 12-month | 540 | Brown Field | San Francisco County | 5/31/2000 | 3/1/2006 |
Ridgecrest Solar Power Project Solar Millennium LLC & Chevron Energy Solutions |
2009-AFC-09 | 12-Month AFC | 250 | |
Kern County | 9/1/2009 | 4/22/2014 |
San Gabriel Generating Station Reliant Energy |
2007-AFC-02 | 12-Month AFC | 656 | |
San Bernardino County | 4/13/2007 | 10/19/2015 |
Sun Valley Energy Project (Peaker) NRG |
2005-AFC-03 | 12-Month AFC | 500 | |
Riverside County | 12/1/2005 | 10/19/2015 |
Willow Pass Generating Station Mirant Corporation |
2008-AFC-06 | 12-Month AFC | 550 | |
Contra Costa County | 6/30/2008 | 10/19/2015 |
Subtotal License Terminated: 2,758
License Denied by Commission, Arranged by Decision Date, 4 projects in list.
License Denied by Commission, Arranged by Decision Date
Project Name Owner Name |
Docket Number |
Process | Capacity (MW) | Project Type | Location | Date Filed | Decision Date |
---|---|---|---|---|---|---|---|
Santa Maria Aggregate |
1987-AFC-02 | AFC | 50 | |
7/27/1987 | |
|
Pacific Waste Management Irwindale MSW |
1984-AFC-05 | AFC | 80 | |
10/31/1984 | |
|
Eastshore Energy Center Eastshore Energy LLC |
2006-AFC-06 | 12-Month AFC | 116 | Brown Field | Alameda County | 9/22/2006 | 10/8/2008 |
Chula Vista Energy Upgrade Project MMC Energy Inc. |
2007-AFC-04 | 12-Month AFC | 100 | |
San Diego County | 8/10/2007 | 6/17/2009 |
Subtotal License Denied: 346 MW
Projects in Review
Projects in Review, Arranged Alphabetically, 7 projects in list.
Projects in Review, Arranged Alphabetically
Item Count | Project Name Owner Name |
Docket Number |
Process | Capacity (MW) | Project Type | Location | Date Filed | Estimated Decision Date | Estimate On-line Date** |
---|---|---|---|---|---|---|---|---|---|
1 | Great Oaks South SV1 |
2020-SPPE-01 | SPPE | 99.0 | |
Sant Clara | 3/19/2020 | |
|
2 | Lafayette Backup Generating Facility Digital Realty |
2020-SPPE-02 | SPPE | 99.8 | |
Santa Clara | 5/20/2020 | |
|
3 | Laurelwood Data Center MECP1 Santa Clara 1, LLC |
2019-SPPE-01 | SPPE | 99 | |
Santa Clara | 3/5/2019 | |
|
4 | Mission College Data Center Oppidan |
2019-SPPE-05 | SPPE | 78.1 | |
Santa Clara | 11/25/2019 | |
|
5 | San Jose City Data Center Microsoft Corporation |
2019-SPPE-04 | SPPE | 99 | |
11/15/2019 | |
|
|
6 | Sequoia Data Center C1-Santa Clara, LLC |
2019-SPPE-03 | SPPE | 96.5 | |
Santa Clara | 8/12/2019 | |
|
7 | Walsh Data Center 651 Walsh Partners LLC |
2019-SPPE-02 | SPPE | 80 | |
Santa Clara | 6/28/2019 | |
|
a | Redondo Beach Repower AES Southland Development, LLC |
2012-AFC-03 | 12-Month AFC | 496 | |
Los Angeles County | 11/19/2012 | Under Suspension Until Filed to Reopen Proceeding | Under Suspension Until Filed to Reopen Proceeding |
UNDER REVIEW TOTAL (Excludes Suspended): 651.4
Projects Announced
Projects Announced, Arranged Alphabetically, 1 projects in list.
Projects Announced, Arranged Alphabetically
Item Count | Project Name | Process | Project Type | Capacity (MW) | Location | Estimated Filing Date |
---|---|---|---|---|---|---|
1 | Hell's Kitchen Geothermal Project Controlled Thermal Resources |
12-Month AFC | Geothermal Steam Turbine | 250 | Salton Sea, Imperial County | |
ANNOUNCED TOTAL: 250
Notes:
* Estimated on-line date if construction is not delayed.
** Estimated on-line date if approved and constructed as proposed.
*** Electricity generation from data center backup generation equipment does not feed into the grid, and therefore contributes zero megawatts (MW)/megawatt hours (MWh) to the system. However, a net MW capacity for the data center backup generation equipment can be calculated to allow a jurisdictional determination. These data centers had a thermal generation capacity of between 50 and 100 MW, allowing each to be processed as a small power plant exemption (SPPE).
Projects with EP in docket number are emergency siting projects.
Megawatts in [ ] are not included in totals.
{1} 1002 MW replaced with 1200 MW for a net increase of 198 MW
{2} 339 MW replaced with 630 MW for a net increase of 291 MW
{3} Calpine has received Commission approval to amend the project to add "duct firing," thereby increasing the total generating capacity from 510 to 590 MW.
{4} Amendment Approved 2/2/2011.
{5} Total MW includes 130 MW amendment approved 6/22/05.
{6} Calpine needs to obtain a new or amended Commission decision for a new location for the Russell City Project (01-AFC-7) approved September 11, 2002, but since "on hold."
{7} El Centro project (06-SPPE-2) is repower of 44 MW Unit 3 at Imperial Irrigation District El Centro Generating Station with 128 MW new facility, for a net increase of 84+ MW.
MW for projects withdrawn, cancelled or expired are not included in total available for possible construction.
Definitions:
Green Field - undeveloped site
Brown Field - developed site
Expansion - New unit at existing power plant site, no loss of existing generation
Repower - Modification of existing equipment
Replacement - Demolition of old plant and construction of new plant
On Hold indicates the applicant has suspended work.
Suspended indicates the committee has suspended the proceeding.